OIL AND GAS INDUSTRIAL EQUIPMENT

Affiliates: 0,03 $how to earn
Pay with:
i agree with "Terms for Customers"
Sold: 0
Uploaded: 26.09.2017
Content: В-2.doc 152 kB

Description

OIL AND GAS INDUSTRIAL EQUIPMENT 4 COURSE. CONTROL WORK №1.

Additional information

Selection of ground and underground equipment for deep-pumping rod operation.
1. Select the size of the rocking machine and the diameter of the pump plunger (choose a rocking machine for rocking machines produced in accordance with GOST 5866-84, according to diagrams compiled by AI Adonin).
2. Select the size of the plunger pump and assign its operating parameters, the stroke length of the plunger and the number of oscillations per minute. When selecting the pump size, pay attention to the specified depth, connecting it with the size of the pump HCH (NGN). In the presence of sand in the fluid, designate the type of plunger (T; K; P; B) and the landing group. When selecting the number of oscillations, try to minimize its value, and when choosing the stroke length to the maximum possible value.
3. Select the construction of the rod string and calculate them for endurance.
4. Select the tubing size, calculate the tubing for strength (from the impact of the tensile load).
5. Determine the load at the suspension point of the rods (according to the formula of ASVirnovsky).
6. Select the size of the machine-rocking machine.
7. Determine the acceleration of the rod suspension point by the refined (approximate theory) in 150 (00; 150; 300; etc. up to 1800).
8. Determine the drive power (according to the formulas of Efremov, Larionov, Ivy).
9. Consider the basic rules of operation of the UK.

Feedback

0
No feedback yet.
In order to counter copyright infringement and property rights, we ask you to immediately inform us at support@plati.market the fact of such violations and to provide us with reliable information confirming your copyrights or rights of ownership. Email must contain your contact information (name, phone number, etc.)