Problems in the economy of the company report +

Pay with:
i agree with "Terms for Customers"
Sold: 0
Uploaded: 26.04.2013
Content: 30426203844547.doc 339,5 kB

Description

Tasks
Problem 1. Calculate the percentage change in material costs for the manufacture of women's coat by changing the application rate depending on the size, based on the data table.
Material Unit. The consumption rate of price per unit, rub.
R.44 R.52
Woolen M 2.7 3.0 7000
Lining M 2.5 2.8 1500
Lining adhesive M 300 1.2 1.5
Threads of silk №18 M 100 100 2
Threads c / b №40 M 220 220 1.5
Buttons Pcs 10 10 100

Problem 2. The volume of building structures - 5523 thousand. Tonnes. Production costs - 2700 thousand. Rub. 1 ths. tons. The cost of raw materials - 60% of the production cost. The duration of the production cycle - 0.06 days per 1 thousand. T. The rate of finished products - 1 day. Data on the raw materials shown in Table.
Materials Unit. rev. Annual demand Price, ths. Rub. The rate of current assets
On the supply of insurance stock
Cement tonnes 4992.86 32 12 2115
Gravel cubic meters. 9036.9 53.3 40 15
Crushed cubic meters. 413.1 132.6 39 15
Metal T 1430.51 1275.3 32 10
Hardware T 222.51 May 16 2215
Sand cubic meters. 4935 35 39 10
Determine the need for working capital:
1) In the reserves of raw materials;
2) work in progress and finished goods inventories.

Task 3. On the basis of the data presented in Table 3, determine the company's needs for working capital for each element in the overall value of working capital, as well as the required increase in working capital in the second quarter.

Task 4. On the basis of the initial data on the activities of the two companies are competitors in the market in the 1st quarter and the planned changes in the 2nd quarter, determine which of the firms efficiently use working capital.
Indicators Company A Company B
The volume of sales, ths. Rub. 2850 2900
Average quarterly balances of current assets, ths. Rub. 267248
The planned increase in the volume of sales in the 2nd quarter,% 5.3 2.3
Reducing the time of one revolution of the working capital, January 2 days
Calculated:
1. The turnover ratio in blocks 1 and 2;
2. load factor of 1 and 2 blocks;
3. The time of one revolution in days 1 and 2 blocks;
4. The release of working capital as a result of reducing the length of one turn.

Problem 5. On the basis of the table, define:
1) The need for working capital to stockpile materials in the plan period The consumption reporting and planning period;
2) Size of the release of working capital as a result of improving the use of materials.
Norma stock materials 25 days. In the planning period was supposed to reduce the rate of flow: A product of - 5% of the product B - 10% of the product B - 8%, on the product D - by 9%, on the product D - by 6%. The annual production capacity will increase by 10%. Prices take unchanged.

Problem 6. Determine the standard of current assets in progress, working capital turnover of the company, if it is known that the production for the year amounted to 10,000 units., The cost of the product - 80 rub., The price of the product is 25% higher than its cost, the rest of the average working capital - 50,000 rub., the duration of the production cycle of manufacturing products - 5 days, the factor of increase of cost of production in progress - 0.5.

Additional information

Problem 7. In the reporting year the working capital of the enterprise amounted to 1400 thousand. Rub. The share of materials in the total amount of current assets - 25%. In the future, it is planned to reduce the material consumption per product by 15%. Determine what will be the value of current assets in the next year, taking into account the reduction in the rate of material consumption.

Problem 8. In the reporting year, the amount of regulated assets in the company amounted to 100,000 rubles. The duration of one revolution of the working capital - 35 days. In the future, the volume of products sold increased by 5%. How many days will reduce the time of one revolution with the same value of normalized working capital?

Problem 9. In the manufacture of 65 units of the product and the cost of 6.5 tons of steel for the price 205 rub. / Ton, fabric - 1725 square meters at a price of 30 rubles. / M, wire - 600 pog.m. at the price of 230 rubles. / rm, adhesive - 800 kg at a price 78 rub. / kg. Determine material consumption products.

Problem 10. It is necessary to define the standards of the garment factory for product A:
- Of tissue in kind and value terms;
- For work in progress;
- On the finished product;
- The total statutory working capital, if it is known that:
Annual output of goods A - 6200 pcs., The consumption of tissue per item 2.8 m for the price of 1 160 m rubles., Supply the fabric is carried out every 15 days, the insurance reserve - 3 days preparation - 5 days, the duration of the production cycle of manufacturing Item A - 0.8 days, the cost of the product - 720 rub., the coefficient of increase of expenses - 0.5, finding the finished product in the warehouse for packing and packaging in the party is in two days.
Problem 11. It is necessary to calculate the actual performance of the company turnover of working capital in the first quarter, based on the following data: sales for the quarter in the amount of 320.2 million. Rub., Working capital balances at 01.01 -23.62 million. Rub., On 01.02 - 34.1 million. rub., on the 01.03 - 30.8 million. rub., on the 01.04 - 39.2 million. rubles.

Report: Economic essence and structure of working capital
List of used literature

Feedback

0
No feedback yet.
In order to counter copyright infringement and property rights, we ask you to immediately inform us at support@plati.market the fact of such violations and to provide us with reliable information confirming your copyrights or rights of ownership. Email must contain your contact information (name, phone number, etc.)